Renovation · Dubai Marina

Marina apartments deserve better than developer interiors.

You bought the view. What came with it was a kitchen walling off the window, a bathroom from a 2008 catalogue and storage designed for nobody. Most Marina towers are now 15+ years old, and it shows indoors long before it shows outside.

We renovate Marina apartments tower by tower: building approvals handled, service lifts booked, neighbours undisturbed, and interiors that finally match the address.

Trusted 5.0 rated on Google
Licensed contractorTower approvals handled140+ projectsLifetime maintenance

At a Glance

Falak Almurjan renovates apartments in Dubai Marina, handling tower NOCs, insurance, deposits and service lift bookings for every building. One bed renovations typically run AED 50,000 to 120,000, larger units to AED 250,000, with kitchens from AED 25,000. Specialities include opening kitchens toward the water view, between tenancy turnarounds completed in weeks, and short let fit outs specified for turnover. Most Marina stock is now 15+ years old and due first full renovation. Free site visits and lifetime maintenance included.

Renovating in Dubai Marina

Tower renovation is its own discipline

High rise work in the Marina is as much logistics and paperwork as it is design. We have both down to routine.

Building approvals and logistics, handled

Every Marina tower has its own management, NOC forms, insurance requirements, refundable deposits and rules on working hours, usually 9am to 6pm with no noisy works on weekends. We prepare the full NOC pack, book the service lift for every delivery, protect corridors and lobbies to the building standard, and keep security and neighbours informed. Owners never chase paperwork, and our record with Marina building managers means approvals come faster each year.

Designed around the view, not against it

The classic Marina floor plan puts a closed kitchen between you and the water. Our most requested transformation opens it into the living space with an island facing the glass, upgrades lighting so evenings do not depend on one ceiling grid, and rebuilds storage along the dead walls instead of the window line. Balconies get flooring and lighting upgrades within community rules, because in this tower district the view is the property.

Built for how Marina apartments earn

A large share of Marina units are investments, holiday lets or future resales, and we spec accordingly: porcelain that survives turnover, quartz that photographs well, hotel grade bathrooms, and kitchens that convince a tenant in the first ten seconds. Between tenancy renovations are sequenced to the week so the unit is earning again fast, and our maintenance team keeps it that way afterwards.

Local knowledge

What matters when you renovate here

01

Approvals

NOCs run through each tower’s building management, with Emaar community rules applying in the original six towers district. We prepare and submit everything.

02

Property mix

One to three bed tower apartments, penthouses and podium villas. Most stock is 2006 to 2012 built and prime for first full renovation.

03

The market

Renovated Marina units rent and sell at a visible premium, and holiday let performance depends heavily on interior photography.

FAQ

Dubai Marina renovation questions

Anything else, contact us or message us on WhatsApp.

How much does an apartment renovation cost in Dubai Marina?+

A full Marina one bed typically runs AED 50,000 to 120,000, two and three beds AED 90,000 to 250,000 depending on scope and finish level. Kitchens alone from AED 25,000, bathrooms from AED 18,000. Every quote is line by line after a free site visit.

Do you handle the building NOC and deposits?+

Yes, completely. We prepare the NOC application, insurance certificates and drawings your building management requires, pay and recover deposits, and book service lifts and working hours. You sign, we run the process.

Can you renovate while the apartment is tenanted or between tenancies?+

Both. Between tenancy renovations are our speciality in the Marina, sequenced to the week so the unit returns to market fast. For occupied units we phase works room by room with sealed zones.

How long does a Marina apartment renovation take?+

Kitchens 3 to 5 weeks, bathrooms 2 to 4 weeks, full apartments 4 to 8 weeks including building approvals. The written programme accounts for your tower’s working hour rules.

Client reviews

Recent work near Dubai Marina

Our Marina apartment was an Airbnb fit out and their spec advice paid for itself in the first quarter. Photo updates every week and no surprises on the invoice.
Omar K.Apartment fit out · Dubai Marina
They handled our tower’s notoriously slow NOC office without me sending a single email. Kitchen now faces the water, as it always should have.
Irina V.Kitchen conversion · Marina Promenade
Three weeks between tenants: new floors, kitchen fronts, both bathrooms. Rented at 22 percent above the old rate.
Hassan A.Between tenancy renovation · Marina Gate
Kitchen and both bathrooms in a Marina Heights two bed, five weeks door to door including the NOC. Zero chasing from my side.
Lena F.Two bed renovation · Marina Heights
They know our tower’s management by name. Service lift booked, corridors protected, not one complaint from neighbours.
Yusuf B.Full renovation · Marina Crown
Furnished and fitted my studio for holiday letting. First month occupancy 92 percent, the photos did it.
Claire T.Short let fit out · Marina Diamond

Ready to renovate in Dubai Marina?

Free site visit within 48 hours, a line by line quote, and the same licensed team on call for as long as you own the property.