Home Renovation · DubaiOne accountable team

The home renovation contractor that stays after handover.

Complete home transformations for apartments, townhouses and villas across Dubai. Modern design, transparent pricing and finishes that lift resale appeal, delivered by a licensed contractor that then stays on as your maintenance team for as long as you own the property.

Trusted 5.0 rated on Google
Dubai MunicipalityEmaarNakheelTrakheesApproved

At a Glance

Falak Almurjan is a licensed home renovation contractor in Dubai serving villas, townhouses and apartments. Clients receive a free site visit, a line by line quotation where the signed number is the invoiced number, a written timeline, weekly photo updates and milestone based payments. The company is approved by Dubai Municipality, Emaar, Nakheel and Trakhees, carries full liability insurance, and remains available as the property’s maintenance team for as long as the client owns it. Typical full renovations run 4 to 16 weeks depending on property type.

Home renovation structural work in progress in Dubai by licensed contractor

What's included

A full renovation under one contract

01  Design and space planning

Layouts reworked around how you live, with 2D and 3D visuals before you commit.

02  Demolition and structure

Safe wall removals and modifications with engineering signoff and municipality approval.

03  Electrical and plumbing

Certified rewiring, new sanitary lines and fixture installation, all properly tested.

04  Flooring, paint and finishes

Tiling, wood flooring, gypsum works and premium paint systems built for Dubai conditions.

05  Kitchens and wardrobes

Custom joinery from our own workshop, fitted precisely to your space.

06  Handover and lifetime care

Quality inspection, full documentation, then ongoing maintenance from the same team.

Pricing guide

Get an instant project estimate

Pick property type, size and finish level for an honest indicative range based on real Dubai project pricing. Final pricing always follows a free site visit with a detailed line by line quotation.

  • 01No hidden fees and no scope creep, every figure documented
  • 02Written timelines we actually hit, with photo updates throughout
  • 03Lifetime maintenance from the same team after handover

Estimated range

AED 135,000 to 165,000

Typical duration: 4 to 8 weeks

These figures are indicative only, not a final quote. You'll get an accurate, often better price after our team visits and surveys your site, free of charge.

Confirm with a free site visit

How we work

Our process, zero surprises

01

Book your free site visit

Call, WhatsApp or use the form. We visit within 48 hours to measure and understand your brief.

02

Get a transparent quote

Line by line costing, designs where relevant and a written timeline, all signed off first.

03

Delivery and lifetime maintenance

Photo updates throughout, inspection at handover, then one number for everything after.

The complete guide

How to choose a home renovation contractor in Dubai, and what to demand

Check the licence, then check the approvals

Anyone can print business cards. A legitimate Dubai renovation contractor holds a trade licence covering the actual works, and if you live in a master community, authority approval from Emaar, Nakheel or Trakhees to work there at all. Ask for both documents before you compare a single price. We hand ours over unprompted at the first meeting, because a contractor who hesitates on paperwork will hesitate on everything else.

Demand a line by line quotation

A one page lump sum quote is how disputes start. You cannot compare it, you cannot adjust it and you cannot hold anyone to it. Our quotations itemise every scope: demolition, each MEP trade, tiling by area, joinery by unit, paint by room, down to fixture supply versus installation. You see what every dirham buys, you can trade specification against budget with full information, and the number you sign is the number you pay.

A written timeline is a promise, not a decoration

Ask a contractor for the timeline in writing and watch the reaction. Ours is part of the contract: milestones for demolition, first fix, finishes and handover, with a weekly photo report so you can verify progress from anywhere in the world. Six years of hitting written timelines across 140+ Dubai projects is the record we bring to that promise.

Insurance protects you, not us

Renovation involves demolition, hot works, heavy materials and other people’s property. Full liability coverage means a dropped slab or a burst pipe is our problem, financially, not yours. Confirm any contractor’s insurance is current and covers your project type. Ours covers every project we run, residential and commercial, and the certificate is available on request.

One team beats five subcontractors

The classic Dubai renovation failure is coordination: the tiler blames the plumber, the plumber blames the electrician, and the owner referees. We keep every trade in house, including our own joinery workshop, under one project manager. When one team owns the whole sequence, work happens in the right order, defects have one accountable owner and the programme actually holds.

What happens after handover matters most

Any contractor can look committed while invoices are outstanding. The test is month six, when a door drops on its hinge or an AC unit trips. Most companies have moved on. Our model is built on staying: the same licensed team remains your maintenance contractor for AC, plumbing, electrical, painting and handyman work for as long as you own the property. One number, saved once, answered every time.

Red flags that predict a bad renovation

After six years of repairing other contractors’ aftermath, the warning signs are consistent: a quotation that fits on one page for a whole property scope; a request for a large cash deposit before any drawing exists; “no need for permits, we know people”; a different phone number every time you call; and no physical address you can visit. None of these guarantees disaster, but together they describe most of the disasters we have been hired to fix. A licensed contractor with an office, itemised paperwork and authority registrations costs a little more at signature and dramatically less by handover.

How our payment structure protects you

You should never be significantly ahead of the work in money paid. Our contracts stage payments against verifiable milestones: mobilisation, first fix completion, finishes, and a final payment held until snagging is closed to your satisfaction. Each release follows a walkthrough or photo report you can verify from anywhere. This structure aligns incentives completely: we get paid by finishing properly, and you are never funding promises, only progress. It is the payment model we would demand as clients, so it is the one we offer.

Snagging, the discipline that separates contractors

Snagging is where renovation promises meet daylight: the paint edge at the ceiling, the door that closes without persuasion, the grout line that runs straight. Our process treats it as a stage, not an afterthought. Before we invite you to inspect, our own quality manager walks the project against a written checklist, the same one our crews build to, and clears the defects professionals notice but owners should never have to. Your walkthrough then generates a shared list with photographs, each item closed and evidenced before the final payment milestone releases. Handover includes the checklist itself, so you can see not just a finished property but the standard it was finished against. Contractors reveal themselves in the last two percent of the work; ours is where we insist on being judged.

Communication, the daily habit behind calm projects

Ask anyone who has renovated badly what went wrong and the answer is rarely technical, it is silence: weeks without updates, questions unanswered, decisions demanded suddenly after days of nothing. Our communication is structured so silence cannot happen. Every project runs a WhatsApp group with your project manager: photo updates at each milestone and every Friday, questions answered same day, decisions flagged a week before they block progress rather than the morning they do. Site visits are welcome anytime, announced or not. Monthly, the programme is restated against actuals, so you always know whether the written timeline is holding, and if a risk to it appears, you hear it from us early with a recovery plan, never discover it late by counting idle days. Overseas owners get the identical rhythm, which is why so many complete projects without flying in. None of this is technology or talent; it is habit, enforced by management, audited by the founders. Calm clients are simply informed clients, and informing you is scheduled work on every project we run.

Client reviews

What clients say about this service

We interviewed five contractors. They were the only one who brought their licence, insurance and a sample line by line quote to the first meeting. Hired, and zero regrets.
Robert C. Full home renovation · Dubai Hills Estate
Eleven months after handover a mixer failed. One WhatsApp and it was replaced in two days at a fair price. That aftercare is why I recommend them.
Huda S. Townhouse renovation · Town Square
The weekly photo reports let me run the whole renovation from London. Handover day matched the 3D design almost frame for frame.
Priya N. Remote renovation · Business Bay
Their quotation had 214 lines. The competitor’s had nine. That told us everything before a single tile was laid.
Andrew G. Townhouse renovation · Mudon
Milestone payments meant I was never funding promises. The final payment released only after my own snag list closed.
Farah J. Apartment renovation · Al Barsha
A contractor who answers in year two is worth more than one who discounts in week one. They answer.
Vikram P. Renovation and aftercare · Jumeirah Village Triangle

FAQ

Frequently asked questions

Anything else, message us on WhatsApp for a same day answer.

What makes you different from other contractors in Dubai?+

We stay after handover. The same licensed team that renovates your home handles AC, plumbing, electrical, painting and handyman work for as long as you own the property.

Are you licensed and insured?+

Yes, fully licensed by Dubai Municipality with authority to work in Emaar, Nakheel and Trakhees communities, plus full liability coverage on every project.

How do payments work?+

Staged payments tied to milestones agreed in writing before work starts. No large upfront sums, no surprise extras mid project.

Can I get a ballpark before a site visit?+

Yes. WhatsApp us photos and rough measurements and you will get an honest indicative range within hours.

One contractor, one number, zero chasing.

Book a free site visit today and see why property owners across Dubai stop searching and stay.